Project Portfolio
Client: Abbot Lab Inc., Irving, Texas
Project: Improved Customer Satisfaction of Medical Devices
Accomplishments:
- Improved communication between organization and the key suppliers by involving suppliers in projects at their inception and bring technical expertise to the purchasing department
- Successfully completed Site Validation Master Plan - Instrument manufacturing
- On-time closure of NCR, NCMR, enteries. Led Verification and Validation (V&V) of major devices and CAPA (Corrective Action and Preventive Actions) initiatives
- Involved in monthly CAPA/ORB meetings
- Troubleshoot failure and led failure investifation through CAPA/ORB team meetings
- Directed CAPA systems and complaints, problem investigation and correcitve action report (PICAR), report writing, 9NCR, QSNCR, NCMR0 Internal and FDA audits, ISO 9000.
Client: Marshall Medical Center, Marshall, Texas
Project: Application of Lean Methodology to improved patient insurance claims and billing pocess
Accomplishments:
- Reduced cycle time for mailing invoices to patients from thirty days to eighteen days
- Reduce number of incoming calls through phone technology upgrades
- Reduced number of filing insurance claims through process modification
Client: Nokia Mobile Phone, Irving, Texas
Project: Improvement of customer satifsaction by Reducing Field Failure Rate of products
Accomplishments:
- Saved a total of $30M within the 1st year of introducing Lean Six Sigma Culture throughout Nokia North
- Minimized Cost of Poor Quality by 15% afterdeveloping real-time process performance and interanl customer-supplier feedback systems
- Improved customer satisfaction and retention, imimized lead tiem on call handling from 6% to 2.9%, and slashed cell phone warranty costs by $10M after enhancing the quality of cell phone units and slashing the cycle time required for corrective action from 139 to 95 days
- Slashed warranty costs associated with reverse logistics from $59M to $39M in 1 year through strategic benchmarking and replacement of units as opposed to credits
Client: Motorola, Chicago, Illionis
Project: New Product Introduction
Accomplishments:
- Reduced reverse logistics from 137 days to 92 days
- Increased design efforts by 20% resulting in an 80% reduction in flow defective units after delivery
- Centralized support of all shipping product and eliminated the need for 80% of the backend analysis
Client: IBM Corporation, Boulder, Colorado
Project: Product Performance
Accomplishments:
- Reduced warranty cost to replace faulty units
- The project was completed on time and below budget
- Production was reduced from $2.14 per unit to $0.14 per unit
- Maintained desired mechanical properties and reduced cost of recalls, reduced loss of revenue